LOLER, the Lifting Operations and Lifting Equipment Regulations 1998, adds duties for lifting equipment on top of PUWER, which still applies alongside it.
It calls for planned and supervised lifts, clear marking of safe working loads, and thorough examination: every 6 months for accessories and equipment that lifts people, every 12 months for the rest. Lifting kit has to satisfy both LOLER and PUWER at the same time.


